In order to implement synchronization with the European electrical grid in Lithuania, buildings for synchronous compensator are being designed in the substation areas in three towns – Telsiai, Alytus and Vilnius.
The Designing Department of Panevezio statybos trestas AB, PST projektai, was responsible for preparation of solutions for architectural, structural, waste supply and waste water, heating, ventilation and air conditioning, security and fire detection parts for the building and the land plot. There were design proposals, engineering and detailed designs prepared.
Client
UAB „Tetas“
Project area
945 m2
Construction site area
9763 m2
Software
GstarCAD, Tekla Structures, Revit