The construction of a massive and complicated building had to be planned in a way that enabled its components to be designed, produced, and delivered in a timely manner, and then installed correctly. The required level of planning was achieved using the BIM model. 70 elements and 30 HGVs daily, 8 tower cranes, a total of 5,000 elements, and a tight building schedule in the BIM model – that is 4D BIM indeed!